Report Type Uploaded Works
Cube Test 18 / Jun / 2019 Construction of protection wall of nallah from Satish Pednekar house to Hari Tuyenkar house in Malbar bund , V.P. Anjuna - Caisua in Siolim Constituency.
Cube Test 18 / Jun / 2019 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Reg. Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure Ta
Material Test 17 / Jun / 2019 Construction of Slab culvert at ch. 0.875 km on LBMC of AIP in survey no. 31/1 of Keri village in Sattari Taluka.
Material Test 17 / Jun / 2019 Improvement to the exsisting Tali at Valpe V.P. Virnoda in Pernem Taluka.
Material Test 17 / Jun / 2019 Improvement to nallah/culvert near Nanda house up to Babajan house at Verla Canca in Siolim Constituency
Cube Test 17 / Jun / 2019 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Reg. Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure T
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part II :Construction of Rising main and reinstatement of allied structures for Anjuna
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part III : Construction of Rising main from ch.4.50km to ch. 7.29kms, Break Pressure tan
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part I : Construction of pump house, manifold and supply & installation of pumps and Mot
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part I : Construction of pump house, manifold and supply & installation of pumps and Mot

Pages

गोवा जलसंपदा विभागात आपले स्वागत आहे

महत्वपूर्ण दुवे

Material featured on this site may be reproduced free of charge in any format or media without requiring specific permission. This is subject to the material being reproduced accurately and not being used in a derogatory manner or in a misleading context. Where the material is being published or issued to others, the source must be prominently acknowledged. However, the permission to reproduce this material does not extend to any material on this site, which is explicitly identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Last Reviewed & Updated on 11 Nov, 2024
Feedback