Report Type Uploaded Works
Cube Test 18 / Jun / 2019 Construction of protection wall of nallah from Satish Pednekar house to Hari Tuyenkar house in Malbar bund , V.P. Anjuna - Caisua in Siolim Constituency.
Cube Test 18 / Jun / 2019 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Reg. Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure Ta
Material Test 17 / Jun / 2019 Construction of Slab culvert at ch. 0.875 km on LBMC of AIP in survey no. 31/1 of Keri village in Sattari Taluka.
Material Test 17 / Jun / 2019 Improvement to the exsisting Tali at Valpe V.P. Virnoda in Pernem Taluka.
Material Test 17 / Jun / 2019 Improvement to nallah/culvert near Nanda house up to Babajan house at Verla Canca in Siolim Constituency
Cube Test 17 / Jun / 2019 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Reg. Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure T
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part II :Construction of Rising main and reinstatement of allied structures for Anjuna
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part III : Construction of Rising main from ch.4.50km to ch. 7.29kms, Break Pressure tan
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part I : Construction of pump house, manifold and supply & installation of pumps and Mot
Cube Test 17 / Jun / 2019 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part I : Construction of pump house, manifold and supply & installation of pumps and Mot

Pages

गोवा जलसंपदा विभागात आपले स्वागत आहे

महत्वपूर्ण दुवे

ही वेबसाइट भारत सरकारच्या गोवा राज्य सरकारच्या जलसंपत्ती विभागाशी संबंधित आहे.

Search form

या साइटवर वैशिष्ट्यीकृत साहित्य पुनरुत्पादित केले जाऊ शकते विशिष्ट परवानगीशिवाय कोणत्याही स्वरुपात किंवा माध्यमामध्ये. हे विषय आहे सामग्री अचूकपणे पुनरुत्पादित केली जात आहे आणि अपमानास्पदपणे वापरली जात नाही रीतीने किंवा दिशाभूल संदर्भात. जेथे सामग्री प्रकाशित केली जात आहे किंवा इतरांना दिलेले, स्त्रोत प्रामुख्याने स्वीकारले पाहिजे. तथापि, हे या सामग्रीची पुनरुत्पादन करण्याची परवानगी यावरील कोणत्याही सामग्रीवर विस्तारित करीत नाही साइट, जी स्पष्टपणे तृतीय पक्षाची कॉपीराइट म्हणून ओळखली जाते. अशा सामग्रीची पुनरुत्पादन करण्यासाठी अधिकृतता कॉपीराइटकडून प्राप्त करणे आवश्यक आहे संबंधित धारक.
अखेरचे पुनरावलोकन केले आणि अद्यतनित केले 11 Nov, 2024
Feedback