Report Type Uploaded Works
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka. Part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dis
Cube Test 24 / Aug / 2021 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works. Part I- Construction of Barrage providing and laying 1000mm dia D.Ipipe Rising main and Break Pressure Tan
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka.part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dist
Material Test 24 / Aug / 2021 Construction of Tail Minor, DO’s, WC’s and FC’s of B/4 distributary and DWC 19L off taking at Ch.18.005km of RBMC of TIP at village Dhargal in Pernem Taluka
Cube Test 24 / Aug / 2021 Providing barbed wire fencing 1.20 mt height on L.H.S and R.H.S side of R.C.C box conduit from ch.31.040 km to 31.835 km along LBMC of TIP in Mapusa city of Bardez Taluka.
Material Test 24 / Aug / 2021 Improvement to the Nallah behind Hotel Terra Pariaso at Gaura Vaddo Calangute in Calangute Constituency.
Cube Test 24 / Aug / 2021 Desilting of Rivulets /Poi, Agriculture fields and reconstruction of existing sluice in Savat Khazan and kharat khazan field at Shirgao in Bicholim Taluka. Sub Est.III:-Reconstruction of sluice (Navi Manas) in Kharat Khazan at Shirigao village in Bicholim
Material Test 24 / Aug / 2021 Improvement to the protection wall for an existing nallah from Vishwas Gaonkar house upto Prakash house and from Domnic D’Souza house upto Pandhari Divkar house at Naik Waddo,Calangute in Calangute Constituency.
Material Test 24 / Aug / 2021 Improvement to Nallah by construction of protection wall in Survey No. 12/1 & 13/7 at Gaonkarwada in Norao Village of Bicholim Taluka.
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka.part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dist

Pages

Welcome to the Department of Water Resources, Goa, India.

Important Links

This Website belongs to Department of Water Resources, State Government of Goa, India.

Search form

Material featured on this site may be reproduced free of charge in any format or media without requiring specific permission. This is subject to the material being reproduced accurately and not being used in a derogatory manner or in a misleading context. Where the material is being published or issued to others, the source must be prominently acknowledged. However, the permission to reproduce this material does not extend to any material on this site, which is explicitly identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Last Reviewed & Updated on 11 Nov, 2024
Feedback