Report Type Uploaded Works
Cube Test 04 / Jul / 2020 Construction of Anjuna Distributory taking off at ch. 28.97 km of the L.B.M.C. of T.I. P. in Siolim & Anjuna Village of Bardez Taluka. Part III :Construction of Rising main from ch.4.50 km to ch. 7.29 kms,
Cube Test 04 / Jul / 2020 Construction of Anjuna Distributory taking off at ch. 28.97 km of the L.B.M.C. of T.I. P. in Siolim & Anjuna Village of Bardez Taluka. Part II:Construction of Rising main and reinstatement of allied structures for Anjuna Distributory from ch.0.00
Cube Test 04 / Jul / 2020 Construction of Field Channels for DWC 1R takes off from Ch. 24.175 and DO 1R takes off from ch. 24.761 kms of LBMC of TIP at Colvale village of Bardez Taluka.
Cube Test 04 / Jul / 2020 Improvement to Porio bund in Ward No. 3 at Pomburpa in Aldona Constituency.
Cube Test 04 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works. Part II : Upgradation of pump house including supply and installation of pumps, motors, control panel and s
Cube Test 04 / Jul / 2020 Desilting of Rivulets / Poi , Agricultural fields and reconstruction of existing Sluice in Savat Khazan and Kharat Khazan fields at Shirgao in Bicholim Taluka.
Cube Test 30 / Jun / 2020 Construction of Field Channels from DWC 3Land 3L/3A takes off from Ch. 25.567 Km of LBMC of TIP at Colvale village of Bardez Taluka.
Cube Test 30 / Jun / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 30 / Jun / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works. Part III : Construction of Bank protection wall for upstream of barrage at Ganjem.
Cube Test 30 / Jun / 2020 Desilting of Rivulets / Poi , Agricultural fields and reconstruction of existing Sluice in Savat Khazan and Kharat Khazan fields at Shirgao in Bicholim Taluka.

Pages

Welcome to the Department of Water Resources, Goa, India.

Important Links

This Website belongs to Department of Water Resources, State Government of Goa, India.

Search form

Material featured on this site may be reproduced free of charge in any format or media without requiring specific permission. This is subject to the material being reproduced accurately and not being used in a derogatory manner or in a misleading context. Where the material is being published or issued to others, the source must be prominently acknowledged. However, the permission to reproduce this material does not extend to any material on this site, which is explicitly identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Last Reviewed & Updated on 21 Mar, 2024
Feedback