Report Type Uploaded Works
Cube Test 06 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 06 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 06 / Jul / 2020 Desilting of Rivulets / Poi , Agricultural fields and reconstruction of existing Sluice in Savat Khazan and Kharat Khazan fields at Shirgao in Bicholim Taluka.
Cube Test 06 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 04 / Jul / 2020 Improvement to the nallah from Damian de Goa Showroom to Vetal Temple in V.P. Socorro in Porvorim Constituency.
Cube Test 04 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 04 / Jul / 2020 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Part I: Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pressure
Cube Test 04 / Jul / 2020 Construction of pump house, Rising main and allied structures for pumping water from ch. 7.190 km to ch. 8.002 km and Gravity main from ch. 8.002 km to 8.780 km of B-6 Distributory of RBMC of TIP at Ugvem in Pernem Taluka.
Cube Test 04 / Jul / 2020 Construction of Anjuna Distributory taking off at ch. 28.97 km of the L.B.M.C. of T.I. P. in Siolim & Anjuna Village of Bardez Taluka. Part III :Construction of Rising main from ch.4.50 km to ch. 7.29 kms,
Cube Test 04 / Jul / 2020 Construction of Anjuna Distributory taking off at ch. 28.97 km of the L.B.M.C. of T.I. P. in Siolim & Anjuna Village of Bardez Taluka. Part II:Construction of Rising main and reinstatement of allied structures for Anjuna Distributory from ch.0.00

Pages

Welcome to the Department of Water Resources, Goa, India.

Important Links

This Website belongs to Department of Water Resources, State Government of Goa, India.

Search form

Material featured on this site may be reproduced free of charge in any format or media without requiring specific permission. This is subject to the material being reproduced accurately and not being used in a derogatory manner or in a misleading context. Where the material is being published or issued to others, the source must be prominently acknowledged. However, the permission to reproduce this material does not extend to any material on this site, which is explicitly identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Last Reviewed & Updated on 11 Nov, 2024
Feedback