Report Type Uploaded Works
Material Test 27 / Jan / 2021 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works Reg. Part I :Construction of Barrage , providing and laying 1000 mm dia. D.I. pipe Rising main and Break Pr
Material Test 23 / Jan / 2021 Improvement of canal lining in between ch. 750 m to 900 m of Sal Distributory in Sal village in Bicholim Taluka.
Material Test 23 / Jan / 2021 Construction of 10 cm thick PCC lining including filter media from ch. 6.00 km to ch. 7.50 km in Nandoda village of Bicholim Taluka.
Cube Test 23 / Jan / 2021 Improvement to the R.B.M.C. of T.I.P. by Providing 100 mm thick RC.C. lining from ch 0.00 kms to 6.020 km excluding Hassapur aquaduct and Kalna aquaduct between Ch 4.165 km to Ch. 4.227 and Ch. 4.772 to Ch. 5.117 km at village Ankane-Hassapur and Hali
Cube Test 23 / Jan / 2021 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part II : Construction of Rising main and reinstatement of allied structures for Anjuna
Cube Test 23 / Jan / 2021 Construction of Anjuna Distributory taking off at ch. 28.97 km of the Left bank main canal of Tillari Iirrigation Project in Siolim & Anjuna Village of Bardez Taluka. Part III : Construction of Rising main from ch. 4.5km to 7.295km,Break Pressuretank(BPT)
Soil Test 16 / Dec / 2020 Strengthening of inspection path in embankment portion of RBMC of TIP between chainage 14.900 km to 15.00 km at village Ozari in Pernem Taluka
Cube Test 16 / Dec / 2020 Improvement to nallah from Crystal Rock shop upto the beach at Murrod waddo candolim in Calangute constituency.
Material Test 09 / Dec / 2020 Construction of farm Road from Main road to Agricultural Plots 25,26,27 & 28 alloted to project Affected people of the Anjunem Irrigation Project at Saleli ( Phase I ) in Sattari Taluka..
Material Test 09 / Dec / 2020 Construction of Tivim Minor from ch. 2.29 km to ch. 3.86 km of LBMC of TIP at Tivim Village in Bardez Taluka.

Pages

Welcome to the Department of Water Resources, Goa, India.

Important Links

This Website belongs to Department of Water Resources, State Government of Goa, India.

Search form

Material featured on this site may be reproduced free of charge in any format or media without requiring specific permission. This is subject to the material being reproduced accurately and not being used in a derogatory manner or in a misleading context. Where the material is being published or issued to others, the source must be prominently acknowledged. However, the permission to reproduce this material does not extend to any material on this site, which is explicitly identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Last Reviewed & Updated on 11 Nov, 2024